Getting a Home Charger Installed

A straightforward job for a qualified installer — here's what to expect.

For most homes this is a same-day job with no drama — a survey, an install, some paperwork the installer handles for you. Here's what actually happens, and what tends to push the cost up.

2–4 hrs typical installation time for a standard job
£800–£1,200 typical cost for a standard 7kW single-phase install, before any grant

What the installer actually does

What typically pushes the cost up

Factor Typical extra cost
Standard 7kW install, short cable run Included in the £800–£1,200 typical range
Trenching for a longer cable run Roughly £30 per metre, plus digger hire if needed
Consumer unit upgrade From around £350, if your fuse box can't take the new circuit as-is
Isolator switch Roughly £100–£200, sometimes required depending on your setup

Do you need a three-phase supply?

Almost certainly not. Three-phase power is what a faster 22kW charger needs, and most UK houses only have a single-phase supply. Getting three-phase installed specifically for home charging is expensive and slow, and it solves a problem most owners don't actually have — a standard 7kW charger already fully recharges most EVs overnight on ordinary single-phase power. Three-phase upgrades occasionally come up for larger properties already considering one for other reasons (like a heat pump or workshop), but it's not something to pursue for charging alone.

DNO notification vs prior approval

A single standard-power charger on a typical home is normally handled as a straightforward notification to your electricity network operator (DNO), which your installer takes care of — you shouldn't need to contact them yourself. Prior approval (rather than just notification) is more likely to apply if you're installing a 22kW three-phase charger, adding more than one charger to the property, or your local area happens to be flagged as electrically constrained — all edge cases for most homes.

Costs here are typical ranges from published UK sources, not a quote — always get two or three quotes from qualified local installers, and confirm whether your installer is OZEV-approved if you're planning to claim the OZEV grant.